Gosport War Memorial Hospital Solar PV
NHS Healthcare
Solar PV Installation: Gosport War Memorial Hospital
495 solar panels installed, delivering 269,000 kWh of clean energy annually and saving 57 tonnes of CO₂ per year.
Southampton General Hospital
NHS Healthcare
Heat Decarbonisation: Southampton General & Princess Anne Hospital
Full Heat Decarbonisation Plan supporting a successful £29.3m PSDS funding application across multiple hospital buildings.
Scaitcliffe House, Accrington
Local Authority
Decarbonisation: Scaitcliffe House, Accrington
Feasibility, PSDS funding support, design and delivery for Hyndburn Borough Council, saving 13.9 tCO₂e annually.
Walton Hall, Warrington Council
Local Authority
Heat Decarbonisation: Walton Hall, Warrington Council
Low-carbon heating strategy for a Grade II listed heritage estate, saving 76 tCO₂e per year with PSDS grant funding secured.
Southfield Hospital Plant Replacement
NHS Healthcare
Southfield Plant Replacement
Full gas boiler to air-source heat pump transition at Southfield Hospital, achieving 100% electric heating and a 17.59% increase in system capacity.
Dumfries and Galloway Heat Network, Annan
Local Authority
District Heat Network Feasibility: Dumfries & Galloway, Annan
Feasibility study for a phased district heat network across 7 delivery zones, assessing 3,959 homes and targeting a 98% carbon reduction.
Guildford Spectrum Leisure Centre glass entrance building, exterior view of the site Salvis carried out a heat decarbonisation plan for
Leisure
Heat Decarbonisation Plan: Guildford Spectrum Leisure Centre
Condition survey and carbon reduction plan for one of the UK's largest leisure centres, targeting an 82% carbon saving by 2030.
Eastleigh House Chiller Replacement
Local Authority
Chiller Replacement Feasibility: Eastleigh House
Dynamic thermal modelling and market testing for Eastleigh Borough Council, identifying modern scroll compressor chillers for a 4,915m² office building.
The Brickworks Museum drying sheds and chimney, Swanwick
Heritage
Lighting & Electrical Design: Brickworks Museum
Electrical load assessment and LED lighting design for two historic drying sheds in Swanwick, using two weeks of site monitoring and supported from design to installation.
Guildford Fire Station, Surrey Fire and Rescue Service
Emergency Services
Heat Decarbonisation: Guildford Fire Station
RIBA Stage 4 M&E design replacing end-of-life gas plant with three R290 air source heat pumps, solar thermal and solar PV, with heating and hot water maintained throughout the works.
Gosport War Memorial Hospital Solar PV

NHS Healthcare

Solar PV Installation: Gosport War Memorial Hospital

495 solar panels delivering 269,000 kWh annually, saving 57 tonnes of CO₂ per year.

View Case Study →
Southampton General Hospital

NHS Healthcare

Heat Decarbonisation: Southampton General & Princess Anne Hospital

Supporting a successful £29.3m PSDS funding application across multiple hospital buildings.

View Case Study →
Scaitcliffe House, Accrington

Local Authority

Decarbonisation: Scaitcliffe House, Accrington

Feasibility, PSDS funding support, design and delivery for Hyndburn Borough Council.

View Case Study →
Walton Hall, Warrington Council

Local Authority

Heat Decarbonisation: Walton Hall, Warrington Council

Low-carbon heating strategy for a Grade II listed heritage estate, saving 76 tCO₂e per year.

View Case Study →
Southfield Hospital Plant Replacement

NHS Healthcare

Southfield Plant Replacement

Full gas to air-source heat pump transition, achieving 100% electric heating.

View Case Study →
Dumfries and Galloway Heat Network, Annan

Local Authority

District Heat Network Feasibility: Dumfries & Galloway, Annan

Phased district heat network across 7 delivery zones, assessing 3,959 homes and targeting a 98% carbon reduction.

View Case Study →
Guildford Spectrum Leisure Centre glass entrance building, exterior view of the site Salvis carried out a heat decarbonisation plan for

Leisure

Heat Decarbonisation Plan: Guildford Spectrum Leisure Centre

Condition survey and carbon reduction plan targeting an 82% carbon saving by 2030.

View Case Study →
Eastleigh House Chiller Replacement

Local Authority

Chiller Replacement Feasibility: Eastleigh House

Thermal modelling and market testing identifying scroll compressor chillers for a 4,915 m² office building.

View Case Study →
The Brickworks Museum drying sheds and chimney, Swanwick

Heritage

Lighting & Electrical Design: Brickworks Museum

Load assessment and LED lighting design for two historic drying sheds, from design to installation.

View Case Study →
Guildford Fire Station, Surrey Fire and Rescue Service

Emergency Services

Heat Decarbonisation: Guildford Fire Station

Gas plant replaced with air source heat pumps, solar thermal and PV in a live fire station.

View Case Study →