Regent House

Residential

Client
Clan (Regent Property) LLP
Sector
Mixed-use / Residential and commercial
Location
Regent House, 136 to 138 George Street, London
Project
Mechanical services design for residential, office, retail and basement areas
Services
Heating and CHP design, basement ventilation, domestic water services, comfort cooling loads and fan coil selection

Mechanical building services design

Salvis provided detailed mechanical building services design for Regent House, 136 to 138 George Street, London. The building mixes apartments, offices, retail and a basement. Each part has different heating, cooling and ventilation needs, and all of it had to work as one design.

Residential and office areas have their own heating systems. The residential plant runs around a CHP unit linked to a 1,000-litre thermal store. Salvis also designed the basement ventilation and domestic water services, and calculated cooling loads and selected fan coils for apartments up to the eighth floor.

Scope of services

  • Office and residential heating design.
  • CHP integration via plate heat exchanger.
  • Boiler arrangements, valve strategies and pipework sizing.
  • Radiator and trench heater selection.
  • Plant room and GA layouts for both heating systems.
  • Basement ventilation layouts, schematics and AHU and fan sizing.
  • Louvre detailing and fire and smoke damper coordination.
  • Hot and cold water services design to the Employer's Requirements.
  • Booster pump, circulation pump and water tank sizing.
  • Residential cooling loads and fan coil schedules.
  • Equipment schedules and technical submissions.

Key systems

  • Three-module Hamworthy Wessex ModuMax gas-fired boiler.
  • SAV Systems XRGI 20 CHP unit feeding a 1,000-litre thermal store via an SAV Q80 heat distributor.
  • Separate office heating with radiators and trench heaters.
  • Basement ventilation, including the boiler room and gas meter room.
  • Boosted hot and cold water services.
  • Fan coil cooling for apartments, reception, retail and the basement gym.

Challenges

  • Several uses in one building
  • Two separate heating systems
  • Integrating CHP
  • A complex basement

Lessons learned

01Separate systems for separate uses

Giving the residential and office areas their own heating lets each be controlled and maintained to suit how it is used.

02Thermal storage gets the most from CHP

A thermal store lets the CHP run steadily and save heat for later, rather than cycling on and off with demand.

03Coordinate basement services early

Basements squeeze plant, fire safety and ventilation into tight spaces. Early coordination avoids clashes later.