Petersfield Hospital
NHS Healthcare
- Client
- Hampshire and Isle of Wight Healthcare NHS Foundation Trust
- Sector
- Healthcare
- Location
- Petersfield, Hampshire
- Services
- Design, procurement and project management
- Value
- £211,000
Who worked on this project
Main electrical switchpanel replacement
Petersfield Hospital is part of the Hampshire and Isle of Wight Healthcare NHS Foundation Trust. Salvis replaced the hospital's main electrical infrastructure, from the 400A switchboard down to the final distribution boards, and inspected the whole site. All work took place in a live hospital. Wards stayed powered throughout.
Scope of services
- Electrical services design at RIBA Stages 3 and 4.
- Procurement support.
- Project management and contract administration for installation and handover at RIBA Stages 5 and 6.
Key systems
- New 400A main switchboard, with generator, load bank and temporary generator connections.
- 4 sub-panel boards and 19 final distribution boards, some relocated out of corridors.
- Temporary generators and manual changeover switches to keep wards live.
- Full EICR of the hospital, with remedial works, fire stopping and making good.
"
Most people see a switch panel as the boring part of a building. Until it fails. Then the whole hospital is in trouble. It becomes a critical incident, and patients get sent to neighbouring hospitals that are already under pressure.
Jamie Cake, Senior Electrical Design Engineer, Salvis
Challenges
- Manufacturer delays
- A live hospital
- Keeping wards powered
- Tight spaces
- Other contracts on site
- Unrecorded equipment
Lessons learned
01Engage stakeholders early and often
Essential in a live healthcare setting.
02Don't rely on stated lead times
Build flexibility into the programme.
03Expect incomplete records
Allow for survey and discovery on older sites.