Petersfield Hospital

NHS Healthcare

Client
Hampshire and Isle of Wight Healthcare NHS Foundation Trust
Sector
Healthcare
Location
Petersfield, Hampshire
Services
Design, procurement and project management
Value
£211,000

Who worked on this project

Mike Keating
Mike Keating
Director of Engineering
View profile →
Dave Humphreys
Dave Humphreys
Senior Electrical Design Engineer
View profile →
Jamie Cake
Jamie Cake
Senior Electrical Design Engineer
View profile →

Main electrical switchpanel replacement

Petersfield Hospital is part of the Hampshire and Isle of Wight Healthcare NHS Foundation Trust. Salvis replaced the hospital's main electrical infrastructure, from the 400A switchboard down to the final distribution boards, and inspected the whole site. All work took place in a live hospital. Wards stayed powered throughout.

Scope of services

  • Electrical services design at RIBA Stages 3 and 4.
  • Procurement support.
  • Project management and contract administration for installation and handover at RIBA Stages 5 and 6.

Key systems

  • New 400A main switchboard, with generator, load bank and temporary generator connections.
  • 4 sub-panel boards and 19 final distribution boards, some relocated out of corridors.
  • Temporary generators and manual changeover switches to keep wards live.
  • Full EICR of the hospital, with remedial works, fire stopping and making good.
New main electrical switchboard at Petersfield Hospital
Jamie Cake, Senior Electrical Design Engineer at Salvis
"

Most people see a switch panel as the boring part of a building. Until it fails. Then the whole hospital is in trouble. It becomes a critical incident, and patients get sent to neighbouring hospitals that are already under pressure.

Jamie Cake, Senior Electrical Design Engineer, Salvis

Challenges

  • Manufacturer delays
  • A live hospital
  • Keeping wards powered
  • Tight spaces
  • Other contracts on site
  • Unrecorded equipment
Electrical works at Petersfield Hospital

Lessons learned

01Engage stakeholders early and often

Essential in a live healthcare setting.

02Don't rely on stated lead times

Build flexibility into the programme.

03Expect incomplete records

Allow for survey and discovery on older sites.