Boathouse swanwick

Hospitality

Client
Brenmar Ltd, on behalf of Premier Marinas
Sector
Hospitality
Location
Swanwick Marina, Southampton
Services
RIBA Stage 4 technical design, modelling and project support

Who worked on this project

Mike Keating
Mike Keating
Director of Engineering
View profile →
David Humphreys
David Humphreys
Senior Electrical Design Engineer
View profile →
Katerina Apostolou
Katerina Apostolou
Mechanical Design Engineer
View profile →

Flagship restaurant technical design

Brenmar Ltd appointed Salvis, on behalf of Premier Marinas, to deliver the RIBA Stage 4 technical design for a new flagship restaurant at Swanwick Marina. The development replaced the existing building with a new food and beverage facility: a restaurant, bar, kitchen and supporting spaces, with outdoor seating overlooking the marina.

The layout includes a 145 m² restaurant, a 71 m² coffee and bar area and a 48 m² kitchen, wash-up and back-of-house area. Salvis modelled 21 spaces across 474 m² of floor area in IES, which set the heating demand and a room cooling load of 45 kW. Salvis then provided detailed design, calculations and technical support through delivery.

Scope of services

  • RIBA Stage 4 technical design.
  • Detailed drawings and design calculations.
  • IES heating and cooling modelling.
  • Technical specifications and design documentation.
  • Contractor coordination and technical delivery support.
  • Project management assistance during construction.

Key systems

  • Heating and cooling design informed by IES modelling.
  • Electrical services design.
  • Emergency lighting provision.
  • Building services for the commercial kitchen and restaurant.
  • Coordinated MEP and structural design.
Restaurant and bar at Swanwick Boathouse
Dining area and track lighting at Swanwick Boathouse
"

We are very happy with the look and feel for the restaurant.

Brenmar Ltd

Challenges

  • High restaurant cooling demand
  • Commercial kitchen requirements
  • Large open dining space
  • MEP and structural coordination
  • Integrating services with the architectural design
  • Supporting technical delivery through construction
Coffee bar with track lighting and emergency signage at Swanwick Boathouse

Lessons learned

01Model performance early

IES modelling set the heating and cooling requirements across 21 spaces, giving quantified loads to design from.

02Design around how each space is used

The restaurant, kitchen, cellar, staff facilities, plant areas and glazed lobby were each assessed individually in the building model.

03Coordinate design through delivery

Detailed drawings, specifications and calculations were backed by contractor coordination and technical input through construction.