Airbus building 45

Defence

Client
SSE Contracting
Sector
Aerospace / Commercial offices
Location
Airbus Building 45, Portsmouth
Design basis
Design & Build
Services
M&E services design, thermal modelling, VRF air conditioning and ventilation
Value
£500,000

Who worked on this project

Mike Keating
Mike Keating
Director of Engineering
View profile →

M&E services design

SSE Contracting appointed Salvis to deliver the mechanical and electrical services design for Airbus Building 45 in Portsmouth, a £500,000 Design & Build project. The work replaced and upgraded the office air conditioning and ventilation across an existing three-storey facility.

Salvis surveyed the existing mechanical services and modelled the 2,039 m² building before any new systems were sized. The modelling set loads of around 88 kW heating and 143 kW cooling, which shaped a coordinated approach to the refurbishment.

Scope of services

  • Survey of existing mechanical services.
  • Dynamic building modelling.
  • Heating and cooling load calculations.
  • Mechanical ventilation calculations.
  • Space heating and cooling design.
  • VRF air-conditioning design.
  • Mechanical supply and extract ventilation.
  • Refrigerant leak detection.
  • Associated above-ground drainage.
  • Detailed drawings and technical submissions.
  • Design coordination with SSE Contracting, in the office and on site.
  • Electrical power supplies for the new plant.

Key systems

  • Dynamic thermal modelling: 88 kW heating, 143 kW cooling.
  • Mitsubishi Electric VRF air conditioning.
  • Ducted, cassette and wall-mounted indoor units.
  • Mitsubishi Lossnay heat-recovery ventilation.
  • Mechanical supply and extract ventilation.
  • Dedicated LV supplies to external condenser units.

Challenges

  • Understanding actual building loads
  • Designing around an existing building
  • Coordinating services across three floors
  • Supporting the new plant electrically

Lessons learned

01Model before sizing

Dynamic modelling set the heating, cooling and ventilation needs first, so equipment was sized to calculated loads, not assumptions.

02Survey existing services first

Surveying the existing mechanical installations before detailed design gave an accurate starting point in an occupied building.

03Coordinate the M&E design

Designing the HVAC alongside the electrical infrastructure that serves it produced one coordinated building services solution.