Bohunt School
Education
- Client
- T&K Services
- Sector
- Education
- Location
- Bohunt School, Wokingham
- Project
- Two-storey sixth form extension
- Design stage
- RIBA Stage 4 Technical Design
- Services
- Building energy modelling, Part L SBEM, heating, cooling and ventilation, water services, drainage, LV distribution, lighting, data, fire alarm and security
Who worked on this project
Mechanical, electrical and energy design
T&K Services appointed Salvis to provide building energy modelling and M&E design for the new two-storey sixth form extension at Bohunt School Wokingham. The extension has 14 classrooms and labs, plus specialist teaching spaces, served by more than 100 data and AV points.
Salvis took the design through to RIBA Stage 4. IES-VE modelling shaped the heating, cooling and overheating strategy. A new 250A sixth form switchboard supplies the extension, with dedicated distribution to the café, IT, science, lighting and power.
Scope of services
- IES-VE thermal modelling and heating and cooling load calculations.
- TM52 overheating analysis.
- As-designed and as-built Part L SBEM assessments.
- Space heating and cooling design.
- Mechanical and natural ventilation.
- Domestic hot and cold water services and above-ground drainage.
- LV distribution, small power and lighting.
- Electrical containment and data infrastructure.
- Fire alarm, security and access control.
- Drawings, equipment schedules and technical submissions.
Key systems
- IES-VE modelling with TM52 overheating analysis.
- Part L SBEM assessments, as designed and as built.
- Hybrid ventilation to teaching spaces and MVHR to offices.
- Dedicated cooling for ICT and server rooms.
- New 250A sixth form switchboard, fed by a 95mm² cable over a 75m route.
- More than 100 data and AV points.
Challenges
- Different demands across teaching spaces
- Overheating and ventilation
- Integrating with the existing school
- Energy compliance
Lessons learned
01Model overheating early
TM52 analysis at design stage shows how classrooms will cope in warm weather, before the ventilation and cooling strategy is fixed.
02Design room by room
Hybrid ventilation in classrooms, MVHR in offices, dedicated cooling for server rooms. Each space gets what it needs.
03Use what's already there
Reusing spare capacity in existing containment cuts cost and disruption when extending a working school.