Courtyard at Bohunt School Wokingham, with timber-clad glazed buildings, red-brick teaching blocks and picnic benches
Courtyard at Bohunt School Wokingham, with timber-clad glazed buildings, red-brick teaching blocks and picnic benches

Bohunt School

Education

Client
T&K Services
Sector
Education
Location
Bohunt School, Wokingham
Project
Two-storey sixth form extension
Design stage
RIBA Stage 4 Technical Design
Services
Building energy modelling, Part L SBEM, heating, cooling and ventilation, water services, drainage, LV distribution, lighting, data, fire alarm and security

Who worked on this project

Dave Humphreys
Dave Humphreys
Senior Electrical Design Engineer
View profile →

Mechanical, electrical and energy design

T&K Services appointed Salvis to provide building energy modelling and M&E design for the new two-storey sixth form extension at Bohunt School Wokingham. The extension has 14 classrooms and labs, plus specialist teaching spaces, served by more than 100 data and AV points.

Salvis took the design through to RIBA Stage 4. IES-VE modelling shaped the heating, cooling and overheating strategy. A new 250A sixth form switchboard supplies the extension, with dedicated distribution to the café, IT, science, lighting and power.

Scope of services

  • IES-VE thermal modelling and heating and cooling load calculations.
  • TM52 overheating analysis.
  • As-designed and as-built Part L SBEM assessments.
  • Space heating and cooling design.
  • Mechanical and natural ventilation.
  • Domestic hot and cold water services and above-ground drainage.
  • LV distribution, small power and lighting.
  • Electrical containment and data infrastructure.
  • Fire alarm, security and access control.
  • Drawings, equipment schedules and technical submissions.

Key systems

  • IES-VE modelling with TM52 overheating analysis.
  • Part L SBEM assessments, as designed and as built.
  • Hybrid ventilation to teaching spaces and MVHR to offices.
  • Dedicated cooling for ICT and server rooms.
  • New 250A sixth form switchboard, fed by a 95mm² cable over a 75m route.
  • More than 100 data and AV points.

Challenges

  • Different demands across teaching spaces
  • Overheating and ventilation
  • Integrating with the existing school
  • Energy compliance

Lessons learned

01Model overheating early

TM52 analysis at design stage shows how classrooms will cope in warm weather, before the ventilation and cooling strategy is fixed.

02Design room by room

Hybrid ventilation in classrooms, MVHR in offices, dedicated cooling for server rooms. Each space gets what it needs.

03Use what's already there