Client:
Southern Health NHS Foundation Trust
Description:
Feasibility studies for the replacement of lighting across 11no hospital sites.
Location:
Hampshire
Works Scope:
Full electrical services, including:
• Site survey of existing lighting installations
• Proposals for new energy efficiency LED lighting
• Budget installation works costs
• Calculations for energy and carbon emissions saving, and investment payback period
• Advice on sources of external funding
The feasibility study identified:
• £645,500 works costs
• £170,000 annual electricity saving
• £39,000 annual maintenance saving
• 302 tonnes/CO2 carbon emissions savings
• 3.1 years payback period